国产做a爱片久久毛片a片,国产在线视频主播区,国产成人a区在线观看视频,亚洲精品高清av在线播放,国产熟睡乱子伦视频在线播放

      ¢ÝIn the wintertime, when meet the difficulty of starting the diesel engine, pull out the rubber plunger of diesel engine, pour into 2CCL/O and stopper.

     Note: Should the stopper move away, the ash will be inbreathed by the diesel enging, induce the diesel engine damage.

3)Operation of the vane pump:

     ¢ÙKeep running Without loading 2-3 minutes after starting (except for emergency) , move the timing control handle in the low mark to increase the

     speed of the diesel engine. In this moment, push the handle of the vane pump in the direction departing from the diesel engine, to fasten the V-type belt in order to drive the vane pump.

     ¢ÚIt express that the guiding water have finished when there are spraying in the discharge opening of the vane pump, meantime the pressure risen abruptly indicating in the pressure meter. Slowly opening the discharge valve, there will be spraying from the gun of the water hose.

     ¢ÛResetting the guiding water pump handle, stop the guiding pump and shut off the plug valve of the guiding pump in the same time.

4)Rurming work:

    ¢ÙIn the period of running work, must adjust the water scale of the switch for the water distributor as per the needs, to ensure the water pump works in the operating condition required.

    ¢Úlnspect and put attention to whether the diesel engine in working order, otherwise, stop and debar faults.

5)Stop diesel engine:

    Before stop the diesel engine, push the timing handle in the low speed for 2-3 minutes and put the timing handle in the stop location scale, then push the F.O. switch in the location of¡®S ' (i.e. Shut off)

    Note: Must decrease loading gradually before stopping the diesel engine, otherwise the temperature rise singularly..Don't use the decreasing pressure handle to stop.

5.Pump unit maintain:

    ¢Ùin the condition of diesel engine using infrequently, must start 2 times every month, keep run with loading for 10-20 minutes each time to insure it can be operated in working order when emergency.

    ¢ÚAfter work over, the suction pipe, discharge water hose, water distributor and direct current water gun remove, airing, tidy up and place in the ventilated location, check frequently to keep good condition.

    ¢ÛAfter the water pump touching the sea water and stop using, drain all remain S.W. inside, wash with F.W. ot reduce the rust in the surface.

    ¢ÜAfter using the water pump in the wintertime, must open drain faucet, drain all remain water inside to avid freeze up.

    ¢ÝMust inspect frequently connecting fasteners in all location to avoid loose.

    ¢ÞMaintain of the diesel engine as per'Diesel Engine operating instruction'.